Post-Tensioned Slabs On Grade

Post-Tensioned Slabs On Grade

We have a project in the works that has potential for soil movement of subgrade because of wet and dry cycles. It may require a post-tensioned slab on grade.  We will group the cables and space them throughout a slab, just as we would an elevated slab. After the concrete is poured, but before it [Read More]